Example values: a $1,250 vendor check owed to a Colorado owner, on the report due in 2027. It runs in your browser; nothing you enter leaves this page.
How the builder works
Pick the owner's state, the report you are working toward, the property and its amount. The builder reads that state's row in the due diligence table and does four things, each shown with the state's own words and a link to its source.
- The mailing window. It counts the state's window back from the last day to file the report due in the year you pick, using the same rule as the escheat date calculator. Colorado, like Indiana, uses the 2016 act's window: Indiana's statute sends the notice “not more than one hundred eighty (180) days and not less than sixty (60) days before filing the report”. For Colorado's report due before November 1, 2027, that puts the window at May 4 to September 1, 2027.
- The letter date. Unless you set one, it picks the latest date in the window that still leaves the owner 30 days to answer before you file. A date outside the window shows as too early or too late.
- The threshold and method. It tells you whether this item needs a letter at all, and whether certified mail applies. Florida, for example, wants a second notice by certified mail over $1,000: “If the value of the property is greater than $1,000, the holder must send a second written notice by certified United States mail, return receipt requested”.
- The wording. 17 jurisdictions set the letter's heading in their statute. The builder prints that heading word for word with the reply date filled in, lists every item the statute requires, and adds the lines those items call for (a sale warning, the holder's contact details, a virtual currency line). Elsewhere it lists what the state says the letter must contain and uses a plain title.
C.R.S. 38-13-501 and 502 (the due diligence table); dates computed by the builder.
Statutory headings
Most states that adopted the 2016 uniform act copy its heading with their own office named, and a reply date 30 days after the letter. Delaware's reads “The State of Delaware requires us to notify you that your property will be transferred to the custody of the State Escheator”. Montana, Tennessee and Indiana write the 30 days into the heading instead of a date. California's heading is its own, in capitals, and four statements must follow it “in boldface type or in a font a minimum of two points larger than the rest of the notice” (Cal. Code Civ. Proc. 1520(b)); the builder marks them. Where the state publishes a sample letter, the builder links it (40 of 51 in the saved sources); use the state's sample when it is stricter than the draft.
The draft follows the general due diligence letter template, filled for one state. Use the template when you write one letter for owners in many states; use the builder when you mail by state and want each state's heading and items exactly.
Worked examples
Each row is what the builder returns, from the Python twin of the browser code; the browser was checked against every row, letter text included, and 400 random cases (round e003). Dates assume you file on the last day.
| Case | Mailing window | Letter date | Threshold and method |
|---|---|---|---|
| Colorado vendor check, $1,250, report due 2027 | May 4, 2027 to September 1, 2027 | September 1, 2027 (inside the window); reply by October 1, 2027 | Letter required |
| Florida vendor check, $1,800 (second, certified notice), 2027 | November 1, 2026 to January 30, 2027 | January 30, 2027 (inside the window); reply by March 1, 2027 | Letter required; certified mail |
| Delaware securities, any value, 2027 | November 1, 2026 to December 31, 2026 | December 31, 2026 (inside the window); reply by January 30, 2027 | Letter required |
| California customer credit, $75, Notice Report 2027 | November 1, 2026 to May 1, 2027 | May 1, 2027 (inside the window); reply by May 31, 2027 | Letter required |
| New York vendor check, $1,500 (certified over $1,000), 2027 | No window computed: First-class 90+ days, certified 60+ days before (business: Dec. 10, Jan. 10) | December 10, 2026 (no window computed); reply by January 9, 2027 | Letter required; certified mail |
| Texas customer credit, $200 (under $250), 2027 | no later than May 2, 2027 | May 2, 2027 (inside the window); reply by June 1, 2027 | Under the threshold |
| Connecticut payroll check, $300, report due March 31, 2028 | July 1, 2027 to September 30, 2027 | September 30, 2027 (inside the window); reply by October 30, 2027 | Letter required |
| Illinois virtual currency, $2,400 (certified), 2027 | April 30, 2026 to March 1, 2027 | March 1, 2027 (inside the window); reply by March 31, 2027 | Letter required; certified mail |
| Maine securities, $500 (liquidation warning), 2027 | May 4, 2027 to September 1, 2027 | September 1, 2027 (inside the window); reply by October 1, 2027 | Letter required |
| North Carolina credit, $30, letter dated January 5, 2027 | July 3, 2027 to September 1, 2027 | January 5, 2027 (too early); reply by February 4, 2027 | Letter required |
| North Carolina credit, $30, letter dated August 15, 2026, report due 2027 (too early) | July 3, 2027 to September 1, 2027 | August 15, 2026 (too early); reply by September 14, 2026 | Under the threshold |
| Ohio vendor check, $1,000 (certified), 2027 | No window computed: Before the report, at least 30 days ahead of it | August 2, 2027 (no window computed); reply by September 1, 2027 | Letter required; certified mail |
| Tennessee refund, $60, 2027 | May 4, 2027 to September 1, 2027 | September 1, 2027 (inside the window); reply by October 1, 2027 | Letter required |
| Washington vendor check, $45 (under $50), 2027 | May 4, 2027 to September 1, 2027 | September 1, 2027 (inside the window); reply by October 1, 2027 | Under the threshold |
| Wisconsin payroll check, $80, letter dated October 15, 2027 (too late) | July 4, 2027 to September 2, 2027 | October 15, 2027 (too late); reply by November 14, 2027 | Letter required |
What it does not do
It does not find owners, check addresses or mail anything; it drafts one letter for you to finish and send. It counts the window from the last day to file, so if you file early, move the letter earlier too. It does not apply aggregate rules (several small items for one owner that add up past the threshold, which Iowa, Maine and South Dakota count per owner), the second mailings some states want after returned mail (Missouri asks for a resend to a new address), or email notice, which many states allow only where the owner consented. Insurers, banks and other holders with their own report dates should check the state page. The state's statute and its office are the final word on wording; the builder never adds a promise the statute does not make.
Questions holders ask
When should I mail due diligence letters?
Inside the state's window before the report: 60 to 180 days before filing in many 2016 act states, no more than 120 days in others, 6 to 12 months before the Notice Report in California, and July 1 to September 30 in Connecticut. The builder computes the dates for the report you pick.
Does every item need a letter?
No. Most states set a minimum, usually $50, and some send all securities or safe deposit box contents regardless of value. The builder tells you whether the amount you enter needs a letter.
When is certified mail required?
New Jersey always requires it. Florida, Georgia, New York and Ohio add it above a dollar amount, and Illinois, Maine and Nevada for securities, virtual currency and some other property of $1,000 or more.
Can I change the wording of the heading?
Most statutes say the heading must read substantially as set out, so keep the state's words. The builder prints them exactly, with your reply date in place of the bracketed instruction.
Is anything I type sent anywhere?
No. The letter is built in your browser and nothing you enter leaves the page. Copy it into your own letterhead.